CASE STUDIES
3D Scaffolding Ltd Logo
How Can We Help

Case Studies

Click the images above to enlarge

Gateway Salford University, Salford

Client: Bam Construction

Value: £490,000

Overview:

Large University Building

The Problem

A large schedule of works was the initial brief for the construction of a new state of the art drama teaching facility. Within a live University grounds.

The Solution

The stand out scaffold was the atrium which required designing to accommodate roof construction whilst the base had to span an acoustic floor which was unable to support any kind of weight or scaffolding materials whatsoever.

Achievements

The support scaffold was designed to accommodate the movement of MEWP’S across theatre floor with a beamed access scaffold for atrium glazed roof spanning 24m across top floor to allow works at ground level to progress. The boarded platform was overlaid with ply boarded and felted to form a temporary roof.
The beamed access was completed within the 4 weeks. And dismantled in 5 days.

Customer Testimonial

“We found working with 3D scaffolding Ltd was a simple process; they understood our requirements from the outset and delivered quality scaffolds time and time again…. It is not coincidence that they are a “Category A” supplier.”

  Back to Case Studies
  • Home
  • Terms & Conditions
  • Privacy Policy
  • Cookies Policy
  • Contact

The Oasis, Northbank Industrial Park, Irlam, Manchester, M44 5BL

Tel : 0161 777 9303

info@3dscaffolding.co.uk

Website Design